Rail

Supply of ticketing equipment and systems

3 October 2017
Body
Date published: 4 October 2017 Closing date: 31 January 2018 We have completed the substantive phase of our review into the market for the supply of ticketing equipment and systems. Our review included looking at the supply of ticket vending machines (TVMs), ticket issuing systems (TIS), and, ticket gates. Our review considered whether any structural or conduct related issues in the markets for

System operation in control period 6 (CP6)

21 September 2017
Body
This page provides details of our work and publications on developing the framework for Network Rail’s national system operator (NSO) in control period 6 (CP6) as part of the 2018 periodic review (PR18).

Consultation on ORR's approach to track access and the future operation of High Speed 2 (HS2)

11 September 2017
Body
Conclusions On 9 April 2018, we published our conclusions to our September 2017 consultation and we also updated the original consultation letter so that it is now a regulatory statement. September 2017 consultation Date published: 21 September 2017 Closing date: 20 October 2017 The purpose of this consultation was to seek views on how ORR proposed to take into account the future operation of HS2