1.1 The safety management system is the basis for making sure a transport system runs safely and in line with ROGS. You must keep written records of your arrangements for managing safety risks. This includes the 'lower-risk' operations (tramways and transport systems that do not operate at speeds above 25mph (40km/h)) that do not need safety certificates or authorisations from us. These operations still need a safety management system.
Differences between mainline and non-mainline railways
1.2 You must have a safety management system that is capable of controlling all the risks arising from the transport system you are operating or managing. The main factor in deciding how detailed and complicated the safety management system needs to be is the size and nature of the transport system you are operating or managing, rather than whether or not it is part of a 'mainline' railway.
1.3 However, ROGS are different for mainline and non-mainline railways. The main differences are as follows:
- The safety management system of both a mainline and a non-mainline railway should include targets. For a mainline railway, these are Common Safety Targets (CSTs). These are the minimum safety levels that must be reached by the mainline railway system, or parts of the mainline railway system, expressed in risk categories as defined in paragraph 2 of Schedule 11. Common Safety Methods (CSMs) for risk evaluation and assessment and monitoring also apply to the mainline railway.
- The safety management system of a mainline railway must allow it to meet national technical specification notices, national safety rules, common safety methods and other conditions where these apply. The safety management system of a non-mainline railway must allow it to meet whatever technical specifications and procedures are relevant to the type of transport system being operated / managed.
1.4 The type of safety certificate or authorisation you need to get from us will vary (see chapter 3).
1.5 We are not allowed to 'exempt' transport operators on the mainline railway from any of their duties under ROGS (that is, we cannot allow any transport operator on the mainline railway to not meet their duties under ROGS). The only exception to this is an Operator of Last Resort applying for a safety certificate or safety authorisation and the requirement to consult ‘affected parties’ on their application, as laid out in regulation 17(3)(a)(i) and (ii). More details are available in paragraph 3.28.
What duty holders must do
Requirements of a Safety Management System
1.6 The safety management system has four main purposes:
- Defining roles and responsibilities for making sure the transport system can be run safely (for example, that workers are provided with suitable training and suitable information
- Setting arrangements for how managers control the safety management system (at all levels);
- Showing how workers and their representatives are involved; and
- Making sure the transport operator continuously improves (through setting targets, and carrying out audits and reviews).
1.7 The need to meet these aims should be the ‘driving force’ behind making sure that every part of the safety management system works and is put into practice.
The basic parts of a Safety Management System
1.8 Under ROGS, the safety management system must be appropriate for the size and nature of the transport system you are running.
Safety policy statement
1.9 This should be signed by the Chief Executive and shared with all employees.
Safety targets
1.10 You must set targets for maintaining and improving safety, and explain how you plan to achieve them. This should include your own targets or targets set by the organisations that represent you. Mainline operators must also take account of the CSTs established for the parts of the mainline railway they operate on.
Procedures for meeting standards derived from national technical rules, national safety rules and national technical specification notices
1.11 These should be designed to make sure:
- you meet your duties under safety law;
- you take any action we have identified as being necessary; and
- the transport system meets national technical and operational safety standards and specifications (particularly National Technical Specification Notices (NTSNs), National Technical Rules (NTRs), Railway Industry Standards (RISs), and Railway Group Standards (RGSs)) for the mainline railway.
1.12 Mainline infrastructure managers must design their safety management system in a way that allows transport undertakings who use the infrastructure to meet the relevant standards and targets.
Risk assessment and controlling new risk
1.13 You should design your systems and procedures to make it easy for you to assess and control all risks. This includes planning how you will work with other relevant operators to identify and control shared risks.
1.14 You should also assess risks arising from activities not connected with the operation itself (for example, from vandalism).
1.15 You must put in place a change-management process to identify and control new risks.
1.16 Some projects to introduce new or altered vehicles or infrastructure on non- mainline railways will need to go through a safety verification process if they could create significant new or different safety risks (see chapter 2). If this is the case, your safety management system must include a description of the safety verification process you are using.
1.17 Most significant projects on the mainline will need to meet the requirements of the CSM for risk evaluation and assessment (Commission Implementing Regulation (EU) 402/2013) as retained and corrected within the UK.
Training and skills
1.18 You must have systems in place for making sure that persons are trained and have the skills they need to carry out the tasks they are asked to do.
Managing safety-related information
1.19 You should have standard procedures and formats in place for recording safety- related information across your organisation. Operators must also make information available in a way that is useful to other operators.
Responding to accidents and near misses
1.20 You should have systems in place to make sure that:
- you meet your duties to report accidents to the right authority (this could be one or more of us (ORR), the Health & Safety Executive or the Rail Accident Investigation Branch);
- you carry out thorough investigations;
- you identify the causes of accidents and near misses; and
- you take the right action to make sure these accidents and near misses won’t happen again in the future.
1.2 Incidents that could put people in danger should be investigated as thoroughly as accidents that actually do cause harm. This is a vital part of the process of controlling risk.
Emergency planning
Schedule 1, Paragraph 2(j)
1.22 This must cover the information given to the emergency services to allow them to plan their responses to incidents on the railway. Also important are the parts of the safety management system that are relevant to the arrangements for responding to emergencies, such as training for emergencies and testing plans. Mainline infrastructure managers must co-ordinate their emergency procedures with relevant transport operators.
Internal auditing
1.23 You must describe the process you use to assess whether the safety management system is effective and develop evidence to use to review the system.
Common safety methods
1.24 Following EU Exit, duty holders still need to apply the relevant Common Safety Methods (CSMs) that have been retained in UK law as part of maintaining their safety management system. The CSMs that duty holders need to apply are set out below. There are some minor amendments to these CSMs following the UK’s exit from the EU and they should therefore be read alongside the EU exit legislation referred to in the introduction section.
CSM for risk evaluation and assessment
1.25 The CSM for risk evaluation and assessment (CSM REA) (Commission Implementing Regulation (EU) 402/2013) applies when any technical, operational or organisational change is being proposed on the railway system. A person making the change needs to firstly consider if the change has an impact on safety. If there is no impact on safety, the risk management process in the CSM REA does not need to be applied. The person making the change needs to keep a record of how they arrived at their decision.
1.26 If the change has an impact on safety, the person making the change must decide whether it is significant or not by using criteria in the CSM REA. If the change is significant, the risk management process must be used. If the change is not significant, the person making the change must keep a record of how they arrived at their decision.
1.27 The EU Exit regulations made some changes to Regulation 402/2013, including changes to the use of mutual recognition and relaxed criteria when a significant change is made. See guidance document on Common safety method for risk evaluation and assessment for more details.
CSM for monitoring
1.28 The CSM for monitoring is set out in Commission Regulation (EU) 1078/2012 . It was amended by the Rail Safety (Amendment etc) (EU Exit) Regulations 2019 (S.I. 2019/837). It applies if you are a transport undertaking, an infrastructure manager, or an ECM. You will need to ensure that:
- the risk control measures implemented by your contractors are monitored using the process in the CSM; and
- your contractors apply the same process through contractual arrangements.
CSM for supervision
1.29 The CSM for supervision is set out in Commission Delegated Regulation (EU) 2018/761 and places responsibilities on the ORR. The CSM for supervision provides a common approach for supervision by safety authorities after the issue of a single safety certificate or a safety authorisation. It has been partly retained in the UK but was amended by the Railways (Safety, Access, Management and Interoperability) (Miscellaneous Amendments and Transitional Provision) (EU Exit) Regulations 2019 (S.I. 2019/1310).