8.1 ROGS requires anyone placing a vehicle in service or using it on the mainline railway to make sure that:
- an ECM has been assigned to the vehicle;
- the details of the ECM are registered on the national vehicle register (NVR);
- the ECM holds an ECM certificate if the vehicle is a freight wagon;
- If the vehicle is not a freight wagon, but is used in cross border operations through the Channel Tunnel, the ECM must hold an ECM certificate.
Who can become an ECM?
8.2 An ECM is:
- anyone responsible for the safe maintenance of a vehicle; and
- registered as the ECM in the NVR.
8.3 Anyone meeting these criteria can become an ECM. This can include people or organisations such as transport undertakings, infrastructure managers, keepers or maintenance organisations. The parties to a contract that relates to a vehicle can decide who will be the ECM. This applies for example when a rolling-stock leasing company leases a vehicle to a transport undertaking. Under the terms of the lease, either the transport undertaking or the leasing company may be responsible for the maintenance of the vehicle and may be the ECM.
What is the NVR?
8.4 The NVR (National Vehicle Register) is a database of vehicles authorised or operated in Great Britain under the Railway (Interoperability) Regulations 2011 (RIR2011). The Secretary of State has appointed Network Rail as the registration entity to maintain the NVR.
Who is responsible for assigning an ECM to a vehicle?
8.5 The registration holder is responsible for assigning an ECM to a vehicle. Manufacturers or 'contracting entities' may also assign an ECM to a vehicle but if they do so, they will be acting in the role of registration holder. A 'contracting entity' is the person who contracts, or intends to contract, with another person for that other person to design, construct, renew or upgrade a subsystem under RIR 2011.
Who is responsible for registering the ECM on the NVR?
8.6 The registration holder is responsible for giving the registration entity details of the ECM. If those details change, the registration holder is also responsible for telling the registration entity about those changes. A transport undertaking hauling a wagon for which the ECM changes should satisfy itself that the registration holder has given the registration entity the details of the new ECM for that vehicle.
8.7 Once the registration entity has been given the ECM’s details, or details of any changes, it must make sure this information is entered on the NVR. The details that the registration entity needs are:
- the name of the ECM;
- the full address of the ECM;
- the Vehicle Number (which identifies the vehicle for which the ECM is responsible);
- the ECM's email address.
8.8 The transport undertaking must ensure that each vehicle it uses has an ECM assigned to it and is registered in the NVR. The transport undertaking is under no obligation to be the ECM for that vehicle.
8.9 A transport undertaking can check if a vehicle has an ECM assigned to it and is registered on the NVR in Great Britain by accessing the GB NVR. Permission to access the NVR is granted by the registration entity.
The role of the ECM
8.10 There are four discrete functions carried out by ECMs:
- The Maintenance Management Function which includes the supervision and coordination of all the maintenance functions and the overall responsibility for the safe running of the vehicle.
- The Maintenance Development Function which includes the management of maintenance documentation, including the configuration management, based on design and operational data as well as on performance and feedback from operating experience;
- The Fleet-Maintenance Management Function which includes managing the removal of the vehicle from the operational railway for maintenance and the return to operation after maintenance; and
- The Maintenance Delivery Function which includes the delivery of the required technical maintenance of vehicles and vehicle parts including the release to service documentation.
8.11 he ECM does not have to carry out the maintenance of the vehicle itself. It can subcontract any or all of the maintenance functions except for the maintenance management function. The identified ECM cannot contract out its responsibility for ensuring the safe running state of the vehicles. It is therefore important that ECMs who subcontract work make sure the contractor is competent.
8.12 If you are an ECM, you must have a system of maintenance in place for all vehicles you are responsible for. The system of maintenance is the process that allows the vehicles to be maintained in line with:
- the maintenance file for that particular vehicle;
- maintenance rules; and
- National Technical Specification Notices.
8.13 RSSB’s Rail Industry Guidance Note on the Application of the ECM Regulations provides further guidance on a system of maintenance. The system described is for freight wagons, but it is applicable to other vehicles.
Cross-Border Operations via the Channel Tunnel
8.14 If you operate cross-border operations via the Channel Tunnel, please read the following: Guidance on Entities in Charge of Maintenance.
Certification
8.15 If you are an ECM responsible for the maintenance of freight wagons within Great Britain, you must hold a valid ECM certificate issued by a UK certification body.
The role of certification bodies
8.16 Certification bodies are responsible for verifying that ECMs comply with the relevant ECM requirements and that they continue to comply throughout the period of validity of the ECM certificate. This means that in addition to carrying out the initial certification activity, certification bodies are expected to establish a surveillance programme. This will typically consist of routine audits and assessments as well as investigating any allegations of non-compliance.
8.17 ORR is no longer an ECM certification body so all applications must be made through an accredited certification body.
8.18 You may appeal to the Secretary of State if you are aggrieved by:
- a decision of the certification body accredited or recognised for the purposes of Schedule 10 either to refuse an application for a UK-issued ECM certificate or taken by that body pursuant to paragraph 7(3), (4) or (7) of Schedule 10; or
- a decision of a certification body accredited or recognised for the retained 2019 EU ECM Regulation, either to refuse an application for a cross-border UK-issued ECM certificate or taken by that body pursuant to Article 7(3), (4) or (7) of the retained 2019 EU ECM Regulation.
8.19 You can ask for details of the appeals process from the certification body.
The role of ORR in ECM certification
8.20 Our role is primarily to supervise the application of the ECM Regulation by ECMs and ECM Certification Bodies. What this means is that we monitor and enforce the application of the Regulation by ECMs and ECM Certification Bodies. We do not issue ECM certificates or carry out routine inspections or audits of ECMs.
8.21 For us to carry out our supervision role effectively we rely on the cooperation of ECMs, ECM certification bodies and operators.
When a certification body withdraws its services
8.22 If a certification body withdraws its services, for example due to the company ceasing trading or leaving the market, the certificates it issued do not automatically become invalid. ECMs that hold certificates issued by the certification body must transfer to a new certification body as soon as practicable and make arrangements for any programmed inspections/audits to be carried out on schedule.