Driver Controlled Operation (or DCO) is a method of working where the driver is responsible for door operation and determining that it is safe to start the train.
If you have suffered physical, mental or emotional harm or economical loss due to an incident on the railway, this leaflet can provide you with guidance on what ORR can do to support you through this difficult time and your rights as a victim of such an incident.
This document provides mainline infrastructure managers and transport undertakings (collectively known as transport operators) with guidance on producing their annual safety reports.
As part of ORR's strategy to raise awareness on occupational health under our health programme, we will publicise recent cases where formal enforcement action has been taken to secure legal compliance.
22 February 2017 The UK rail industry financial information for 2015-16 presents ORR’s analysis of this financial data. Since 2014-15 the publication has widened its coverage of the industry and made methodological and presentational changes. As a result, comparisons with the 2014-15 publication are to be read within that context. It is important to note that underlying data has not changed
We have produced this report to help dutyholders understand how to meet our expectations for the high-level goals that should be achieved by the railway when complying with the health and safety legislation.
Consultation outcome Following this consultation we have published our policy statement relating to a progressive approach to infrastructure authorisation. Approach to authorisations under the Railways (Interoperability) Regulations 2011 22 September 2017 This revised approach will, in some cases, enable applicants to propose grouping together what would currently be separate authorisation
With this consultation we sought views on a draft document ‘Goal-setting principles for railway safety’ which sets out our high-level expectations for new or altered works, railway vehicles, plant and equipment.
The issue of safety relating to the interface between the platform and train and the safe dispatch of trains is an area of focus for the Office of Rail and Road (ORR) and the industry.
This statement sets out and clarifies ORR’s policy on the issue of clearances from parts of 25kV electrification systems to standing surfaces to which members of the public may foreseeably gain access. The principles discussed here should act as guidance for people carrying out infrastructure design work, when looking specifically at the issue of electrical clearances.
We sought views on a standard format for the submission of railway service providers’ financial information to us for safety levy apportionment purposes.
This document provides advice and guidance on the statutory obligations on railway service providers (RSPs) arising under The Railway Safety Levy Regulations 2006 (the Regulations). It also sets out the purpose of the railway safety levy, how it operates and the role of the Office of Rail and Road (ORR).
Date published: 30 September 2016 Closing date: 11 November 2016, 5pm The purpose of this consultation was to seek views on a proposed new General Approval for freight track access contracts, to replace the Freight Access (Track Access Contracts) General Approval 2012. The new General Approval reflects changes in industry processes and the model freight track access contracts, and modifications to
This consultation is now closed. Review of the general approvals - final conclusions Our final conclusions following our consultation on reviewing the General Approval (Stations) 2013 and General Approval (Depots) 2013. Review of the General Approval (Stations) 2013 & General Approval (Depots) 2013 – final conclusions 27 January 2017 General approval for stations (2017) General approval for depots
In May 2016, we published our first major consultation on the 2018 periodic review (PR18). PR18 would determine Network Rail Infrastructure Limited’s (Network Rail’s) outputs and funding in control period 6 (CP6, which will run from 1 April 2019 to 31 March 2024). P
Date published: 10 December 2015 Closing date: 4 March 2016 This consultation looked at the way in which Network Rail charges train operators for use of its network. These charges affect decisions made by operators, Network Rail and funders. This was the first consultation as part of a comprehensive review of Network Rail’s structure of charges for Control Period 6, (CP6) - (2019-2024) and beyond
This consultation is now closed. Conclusions Our conclusion to the consultation and the final guidance document were published on Wednesday 21 December 2016. Consultation responses were received from four stakeholders, and we have responded to all points raised. These include: The inclusion of flow-charts for ease of use The extension of time-limits to 10 working days Various points on the scope
This consultation is now closed. Publication of updated guidance On 30 January 2017, having considered responses to our consultation, we published the final version of our approach to monitoring and reviewing markets. ORR response to consultation Angel Trains Ltd response to consultation Rail Delivery Group response to consultation ORR’s guidance on approach to monitoring and reviewing markets The