List of passenger operators and links to core documents:
Core documents are the original application form, draft supplemental agreement, Network Rail representations, and the operator response to the Network Rail representations. Once a decision has been made on a case, the decision letter and, where relevant, the directions notice and final supplemental agreement reflecting what has been directed is added. The decision letter and, where relevant, the final agreement is also placed on the disputed amendment to contracts (section 22a) page or the decisions on new, disputed contracts (section 17) page.
- Alliance Rail Limited
- Caledonian Sleeper Limited
- East Coast Trains Limited
- First Greater Western Limited
- First Trenitalia West Coast Rail Limited
- Govia Thameslink Railway Limited
- Grand Central Railway Company Limited
- Hull Trains Company Limited
- London North Eastern Railway Limited
Key to contracts:
- Section 17: new disputed contracts
- Section 22A: disputed amendments to existing contracts
Alliance Rail Limited
Section 17 (now withdrawn)
- Alliance Rail Limited section 17: representations from Network Rail dated 28 March 2025 (published 7 April 2025)
- Alliance Rail Limited Section 17: appendices to Network Rail representations
- Alliance Rail response to DfT dated 25 February 2025 (published 28 February 2025)
- Alliance Rail Limited section 17 application: response to Network Rail representations dated 19 July 2024
- Alliance Rail Limited section 17 application: Network Rail representations dated 28 June 2024
- Alliance Rail Limited section 17 application: proposed agreement
- Alliance Rail Limited section 17 application form
Caledonian Sleeper Limited
Section 22A
9th supplemental agreement
- Caledonian Sleeper Limited 9th SA decision letter dated 15 August 2025 (published 20 August 2025)
- Caledonian Sleeper Limited 9th SA directions notice dated 15 August 2025 (published 20 August 2025)
- Caledonian Sleeper Limited 9th SA draft supplemental agreement (published 20 August 2025)
- Caledonian Sleeper section 22a 9th SA: response dated 30 July 2025 to Network Rail representations (published 1 August 2025)
- Caledonian Sleeper Limited S22a 9th SA Network Rail representations dated 15 July 2025 (published 22 July 2025)
- Caledonian Sleeper Limited 9th supplemental agreement: response to Network Rail representations dated 30 July 2024
- Caledonian Sleeper Limited 9th supplemental agreement application: Network Rail representations dated 28 June 2024
- Caledonian Sleeper Limited 9th supplemental agreement application form
East Coast Trains Limited
Section 17 - Rejected
- Applications for access to the West Coast Main Line (WCML): decision letter dated 3 July 2025 (published 3 July 2025)
- East Coast Trains Limited Section 17 response to Network Rail's representations dated 23 May 2025 (published 5 June 2025)
- Network Rail final representations for East Coast Trains Limited S17 dated 4 May 2025 (published 13 May 2025)
- First Rail Holdings response to DfT dated 7 February 2025 (published 11 February 2025)
- East Coast Trains Limited section 17 application: response to Network Rail representations dated 26 July 2024
- East Coast Trains Limited section 17 application: Network Rail representations dated 28 June 2024
- East Coast Trains Limited section 17 application: proposed agreement
- East Coast Trains Limited section 17 application form
Section 22A
17th supplemental agreement (previously the 12th SA) - Approved
- East Coast Trains Limited 17th SA Directions notice (published 18 August 2025)
- East Coast Trains Limited 17th SA Supplemental agreement (published 18 August 2025
- Open access applications for access to the East Coast Main Line (ECML): decision letter dated 29 July 2025 (published 29 July 2025)
- East Coast Trains Limited response dated 19 May 2025 to Network Rail's representations on 17th SA (published 21 May 2025)
- East Coast Trains Limited S22a 17th SA representations from Network Rail dated 2 May 2025 (published 7 May 2025)
- East Coast Trains Limited 17th supplemental agreement annex A summary of applications with access rights on all
- East Coast Trains Limited 17th supplemental agreement annex B table of access rights requested
- First Rail Holdings response to DfT dated 7 February 2025 (published 11 February 2025)
- East Coast Trains Limited 17th supplemental agreement: response to Network Rail representations dated 22 July 2024
- East Coast Trains Limited 17th supplemental agreement application: Network Rail representations dated 28 June 2024
- East Coast Trains Limited 17th supplemental agreement application: proposed agreement
- East Coast Trains Limited 17th supplemental agreement application form
16th supplemental agreement (previously the 11th SA) - Approved
- East Coast Trains Limited 16th SA Directions notice (published 18 August 2025)
- East Coast Trains Limited 16th SA Supplemental agreement (published 18 August 2025)
- Open access applications for access to the East Coast Main Line (ECML): decision letter dated 29 July 2025 (published 29 July 2025)
- East Coast Trains Limited response dated 25 April 2025 to Network Rail's representations on 16th SA (published 21 May 2025)
- East Coast Trains Limited S22a 11th SA: representations from Network Rail dated 28 March 2025 (published 7 April 2025)
- East Coast Trains Limited S22a 11th SA: annexes to Network Rail representations
- First Rail Holdings response to DfT dated 7 February 2025 (published 11 February 2025)
- East Coast Trains Limited 16th supplemental agreement: response to Network Rail representations dated 22 July 2024
- East Coast Trains Limited 16th supplemental agreement application: Network Rail representations dated 28 June 2024
- East Coast Trains Limited 16th supplemental agreement application: proposed agreement
- East Coast Trains Limited 16th supplemental agreement application form
First Greater Western Limited
Section 22A
202nd supplemental agreement - Approved
- First Greater Western Trains 202nd SA response dated 22 May 2025 to Network Rail representations (published 15 August)
- First Greater Western Limited Section 22a 202nd SA Decision Letter (published 31 July 2025)
- First Greater Western Limited Section 22a 202nd SA Directions Notice (published 31 July 2025)
- First Greater Western Limited Section 22a 202nd Supplemental Agreement (published 31 July 2025)
- Network Rail's final representations dated 8 May 2025 for First Greater Western Railway Limited 202nd SA (published 13 May 2025)
- First Greater Western Limited 202nd supplemental agreement: response to Network Rail representations dated 22 July 2024
- First Greater Western Limited 202nd supplemental agreement application: Network Rail representations dated 28 June 2024
- First Greater Western Limited 202nd supplemental agreement application: proposed agreement
- First Greater Western Limited 202nd supplemental agreement application form
201st supplemental agreement - Approved
- First Greater Western Limited s22a 201st SA Directions letter - (published 16 October 2025)
- First Greater Western Trains 201st SA response dated 30 June2025 to Network Rail representations (published 15 August)
- Network Rail's final representations dated 13 June 2025 for First Greater Western Railway Limited 201st SA (published 19 June 2025)
- First Greater Western Limited 201st supplemental agreement: response to Network Rail representations dated 22 July 2024
- First Greater Western Limited 201st supplemental agreement application: Network Rail representations dated 28 June 2024
- First Greater Western Limited 201st supplemental agreement application: proposed agreement
- First Greater Western Limited 201st supplemental agreement application form
First Trenitalia West Coast Rail Limited
Section 22A
18th supplemental agreement - Approved
- First Trenitalia West Coast Rail Limited 22a 18th SA Directions Notice (published 3 October 2025)
- First Trenitalia West Coast Rail Limited 22a 18th Supplemental agreement (published 3 October 2025)
- First Trenitalia West Coast Rail Limited 22a 18th SA Direction Letter (published 2 October 2025)
- First Trenitalia West Coast all 22a SA’s response dated 9 July 2025 to Network Rail representations (published 15 August)
- Appendix A - Interacting Rights Application Tracker
- Network Rail representation on First Trenitalia West Coast Rail 18th Supplemental Agreement - Redacted
- First Trenitalia West Coast Rail Limited 18th supplemental agreement: response to Network Rail representations dated 22 July 2024
- First Trenitalia West Coast Rail Limited 18th supplemental agreement Network Rail representations dated 28 June 2024
- First Trenitalia West Coast Rail Limited 18th supplemental agreement: proposed agreement
- First Trenitalia West Coast Rail Limited 18th supplemental agreement application form
17th supplemental agreement - Approved
- First Trenitalia West Coast Rail Limited 22a 17th SA Directions Notice (published 3 October 2025)
- First Trenitalia West Coast Rail Limited 22a 17th supplemental agreement (published 3 October 2025)
- First Trenitalia West Coast Rail Limited 22a 17th SA Direction Letter (published 2 October 2025)
- First Trenitalia West Coast all 22a SA’s response dated 9 July 2025 to Network Rail representations (published 15 August)
- Appendix A - Interacting Rights Application Tracker
- Network Rail representation on First Trenitalia West Coast Rail 17th Supplemental Agreement - Redacted
- First Trenitalia West Coast Rail Limited 17th supplemental agreement: response to Network Rail representations dated 22 July 2024
- First Trenitalia West Coast Rail Limited 17th supplemental agreement application: Network Rail representations dated 28 June 2024
- First Trenitalia West Coast Rail Limited 17th supplemental agreement: proposed agreement
- First Trenitalia West Coast Rail Limited 17th supplemental agreement application form
14th supplemental agreement (now withdrawn)
- First Trenitalia West Coast Rail Limited 14th supplemental agreement: response to Network Rail representations dated 22 July 2024
- First Trenitalia West Coast Rail Limited 14th supplemental agreement application: Network Rail representations dated 28 June 2024
- First Trenitalia West Coast Rail Limited 14th supplemental agreement application: proposed agreement
- First Trenitalia West Coast Rail Limited 14th supplemental agreement application form
11th supplemental agreement - Resolved as a Section 22 case
- ORR decision letter dated 18 October 2024
- First Trenitalia West Coast Rail Limited 11th supplemental agreement: response to Network Rail representations dated 22 July 2024
- First Trenitalia West Coast Rail Limited 11th supplemental agreement application: Network Rail representations dated 28 June 2024
- First Trenitalia West Coast Rail Limited 11th supplemental agreement: proposed agreement
- First Trenitalia West Coast Rail Limited 11th supplemental agreement application form
3rd supplemental agreement - Approved
- First Trenitalia West Coast Rail Limited 22a 3rd SA Direction Notice (published 3 October 2025)
- First Trenitalia West Coast Rail Limited 22a 3rd supplemental agreement (published 3 October 2025)
- First Trenitalia West Coast Rail Limited 22a 3rd SA Direction Letter (published 2 October 2025)
- First Trenitalia West Coast all 22a SA’s response dated 9 July 2025 to Network Rail representations (published 15 August)
- Appendix A - Interacting Rights Application Tracker
- Network Rail representation on First Trenitalia West Coast Rail 3rd Supplemental Agreement - Redacted
- First Trenitalia West Coast Rail Limited 3rd supplemental agreement application: Network Rail representations dated 28 June 2024
- First Trenitalia West Coast Rail Limited 3rd supplemental agreement application: proposed agreement
- First Trenitalia West Coast Rail Limited 3rd supplemental agreement application form
Govia Thameslink Railway Limited
Section 22A
63rd supplemental agreement - Approved
- Govia Thameslink Railway 63rd SA Decision Letter (Published 20 August 2025)
- Govia Thameslink Railway 63rd SA response dated 7 May 2025 to Network Rail representations (published 15 August)
- Govia Thameslink Railway 63rd SA: decision letter (published 22 July 2025)
- Govia Thameslink Railway 63rd SA: directions notice (published 22 July 2025)
- Govia Thameslink Railway 63rd SA: approved supplemental agreement (published 22 July 2025)
- Govia Thameslink Railway Limited S22a 63rd SA: representations from Network Rail dated 11 April (published 15 April 2025)
- Govia Thameslink Railway Limited S22a 63rd SA: annexes to Network Rail representations
- Govia Thameslink Railway Limited 63rd supplemental agreement: response to Network Rail representations dated 22 July 2024
- Govia Thameslink Railway Limited 63rd supplemental agreement: Network Rail representations dated 28 June 2024
- Govia Thameslink Railway Limited 63rd supplemental agreement: proposed agreement
- Govia Thameslink Railway Limited 63rd supplemental agreement application form
62nd supplemental agreement - Superseded
- Govia Thameslink Railway Limited S22a 62nd SA: representations from Network Rail dated 11 April (published 15 April 2025)
- Govia Thameslink Railway Limited S22a 62nd SA: annexes to Network Rail representations
- Govia Thameslink Railway Limited 62nd supplemental agreement: response to Network Rail representations dated 22 July 2024
- Govia Thameslink Railway Limited 62nd supplemental agreement: Network Rail representations dated 28 June 2024
- Govia Thameslink Railway Limited 62nd supplemental agreement: proposed agreement
- Govia Thameslink Railway Limited 62nd supplemental agreement application form
Grand Central Railway Company Limited
Section 22A
28th supplemental agreement - Approved
- Open access applications for access to the East Coast Main Line (ECML): decision letter dated 29 July 2025 (published 29 July 2025)
- Response from Grand Central Railway Company 28th Supplemental agreement to Network Rails representations dated 11th July 2025 (published 14 July 2025)
- Network Rail representations dated 26 June 2025 for Grand Central 28th SA (published 8 July 2025)
- Grand Central Railway Company Limited 28th supplemental agreement application: Network Rail representations dated 28 June 2024
- Grand Central Railway Company Limited 28th supplemental agreement application: proposed agreement
- Grand Central Railway Company Limited 28th supplemental agreement application form
24th supplemental agreement - Approved
- ORR decision letter dated 27 January 2025
- Grand Central Railway Company Limited 24th supplemental agreement: response to Network Rail representations dated 22 July 2024
- Grand Central Railway Company Limited 24th supplemental agreement application: Network Rail representations dated 28 June 2024
- Grand Central Railway Company Limited 24th supplemental agreement application: proposed agreement
- Grand Central Railway Company Limited 24th supplemental agreement application form
Hull Trains Company Limited
Section 22A
32nd supplemental agreement (previously the 29th SA) - Approved
- Hull Trains Company Limited 32nd SA Directions notice (published 18 August 2025)
- Hull Trains Company Limited 32nd SA Supplemental agreement (published 18 August 2025)
- Open access applications for access to the East Coast Main Line (ECML): decision letter dated 29 July 2025 (published 29 July 2025)
- Response from Hull Trains Company Limited dated 25 April 2025: Annex A (published 21 May 2025)
- Response from Hull Trains Company Limited dated 25 April 2025 (published 29 April 2025)
- Hull Trains Company Limited S22a 29th SA: representations from Network Rail dated 28 March 2025 (published 7 April 2025)
- Hull Trains Company Limited S22a 29th SA: annexes to Network Rail representations
- First Rail Holdings response to DfT dated 7 February 2025 (published 11 February 2025)
- Hull Trains Company Limited 32nd supplemental agreement: response to Network Rail representations dated 22 July 2024
- Hull Trains Company Limited 32nd supplemental agreement application: Network Rail representations dated 28 June 2024
- Hull Trains Company Limited 32nd supplemental agreement application: proposed agreement
- Hull Trains Company Limited 32nd supplemental agreement application form
28th supplemental agreement - Approved
- ORR decision letter dated 27 January 2025
- Hull Trains Company Limited 28th supplemental agreement: response to Network Rail representations dated 22 July 2024
- Hull Trains Company Limited 28th supplemental agreement application: Network Rail representations dated 28 June 2024
- Hull Trains Company Limited 28th supplemental agreement application: proposed agreement
- Hull Trains Company Limited 28th supplemental agreement application form
27th supplemental agreement - Rejected
- Open access applications for access to the East Coast Main Line (ECML): decision letter dated 29 July 2025 (published 29 July 2025)
- Hull Trains Company 27th SA response dated 1 May 2025 to Network Rail representations (published 15 July 2025)
- Hull Trains Company Limited S22a 27th SA: representations from Network Rail dated 11 April 2025 (published 15 April 2025)
- Hull Trains Company Limited S22a 27th SA: annexes to Network Rail representations
- First Rail Holdings response to DfT dated 7 February 2025 (published 11 February 2025)
- Hull Trains Company Limited 27th supplemental agreement: response to Network Rail representations dated 22 July 2024
- Hull Trains Company Limited 27th supplemental agreement application: Network Rail representations dated 28 June 2024
- Hull Trains Company Limited 27th supplemental agreement application: proposed agreement
- Hull Trains Company Limited 27th supplemental agreement application form
London North Eastern Railway Limited
Section 22A
38th supplemental agreement - Superseded
- LNER response dated 24 April 2025 to Network Rail representations (published 29 April 2025)
- London North Eastern Railway Limited S22a 38th SA: representations from Network Rail dated 28 March 2025 (published 7 April 2025)
- London North Eastern Railway Limited S22a 38th SA: annexes to Network Rail representations
- London North Eastern Railway Limited 38th supplemental agreement: response to Network Rail representations dated 24 July 2024
- London North Eastern Railway Limited 38th supplemental agreement application: Network Rail representations dated 28 June 2024
- London North Eastern Railway Limited 38th supplemental agreement application: proposed agreement
- London North Eastern Railway Limited 38th supplemental agreement application: rights table
- London North Eastern Railway Limited 38th supplemental agreement application form
37th supplemental agreement - Superseded
- LNER response dated 24 April 2025 to Network Rail representations (published 29 April 2025)
- London North Eastern Railway Limited S22a 37th SA: representations from Network Rail dated 28 March 2025 (published 7 April 2025)
- London North Eastern Railway Limited S22a 37th SA: annexes to Network Rail representations
- London North Eastern Railway Limited 37th supplemental agreement: response to Network Rail representations dated 24 July 2024
- London North Eastern Railway Limited 37th supplemental agreement application: Network Rail representations dated 28 June 2024
- London North Eastern Railway Limited 37th supplemental agreement application: proposed agreement
- London North Eastern Railway Limited 37th supplemental agreement application: rights table
- London North Eastern Railway Limited 37th supplemental agreement application form
36th supplemental agreement - Superseded
- LNER response dated 24 April 2025 to Network Rail representations (published 29 April 2025)
- London North Eastern Railway Limited S22a 36th SA: representations from Network Rail dated 28 March 2025 (published 7 April 2025)
- London North Eastern Railway Limited S22a 36th SA: annexes to Network Rail representations
- London North Eastern Railway Limited 36th supplemental agreement: response to Network Rail representations dated 24 July 2024
- London North Eastern Railway Limited 36th supplemental agreement application: Network Rail representations dated 28 June 2024
- London North Eastern Railway Limited 36th supplemental agreement application: proposed agreement
- London North Eastern Railway Limited 36th supplemental agreement application: rights table
- London North Eastern Railway Limited 36th supplemental agreement application form
35th supplemental agreement - Superseded
- London North Eastern Railway 35th SA response dated 2 May 2025 to Network Rail representations (published 15 August)
- London North Eastern Railway (LNER) S22a 35th SA: representations from Network Rail dated 11 April 2025 (published 15 April 2025)
- London North Eastern Railway (LNER) S22a 35th SA: annexes to Network Rail representations
- London North Eastern Railway Limited 35th supplemental agreement: response to Network Rail representations dated 24 July 2024
- London North Eastern Railway Limited 35th supplemental agreement application: Network Rail representations dated 28 June 2024
- London North Eastern Railway Limited 35th supplemental agreement application: proposed agreement
- London North Eastern Railway Limited 35th supplemental agreement application: rights table
- London North Eastern Railway Limited 35th supplemental agreement application form
34th supplemental agreement - Approved
- London North Eastern Railway Limited 34th SA: decision letter (published 14 July 2025)
- London North Eastern Railway Limited 34th directions Notice (published 14 July 2025)
- London North Eastern Railway Limited 34th: approved supplemental agreement (published 14 July 2025)
- LNER response dated 24 April 2025 to Network Rail representations (published 29 April 2025)
- London North Eastern Railway Limited S22a 34th SA: representations from Network Rail dated 28 March 2025 (published 7 April 2025)
- London North Eastern Railway Limited S22a 34th SA: annexes to Network Rail representations
- London North Eastern Railway Limited 34th supplemental agreement: response to Network Rail representations dated 24 July 2024
- London North Eastern Railway Limited 34th supplemental agreement application: Network Rail representations dated 28 June 2024
- London North Eastern Railway Limited 34th supplemental agreement application: proposed agreement
- London North Eastern Railway Limited 34th supplemental agreement application: rights table
- London North Eastern Railway Limited 34th supplemental agreement application form