Consultations

Here you’ll find all our consultations, both open and concluded, past policy, licence and access casework consultations. You’ll also find our response to consultations from other organisations.

Consultation on changes to operator licences

24 September 2020
Body
For holders of EU passenger licences we updated their GB Statement of National Regulatory Provisions (SNRP) as well as their station licences on 3 December 2019. On 24 June 2020 we also updated those operators who just hold station licences too. For operators who provide traction only services, we have now modified their SNRPs.

Updating the model freight services track access contract for the CVL interface

27 April 2020
Body
We are making changes to the model track access contract to reflect new arrangements concerning access arrangements for the Core Valleys Lines (CVL). These are particularly relevant for those who wish to operate freight trains between the CVL and Network Rail Infrastructure Ltd’s (Network Rail’s) network.

HS1 Ltd periodic review 2019 (PR19): draft determination

7 January 2020
Body
A summary of our draft conclusions on the final Five Year Asset Management Statement (5YAMS) that was submitted to us on 31 May 2019. It is the culmination of the first phase of our examination and draws from detailed analysis that is explained in a number of supplementary documents published alongside it. Together these form the draft determination.

Periodic review 2018 (PR18) initial consultation and conclusions

10 August 2016
Body
In May 2016, we published our first major consultation on the 2018 periodic review (PR18). PR18 would determine Network Rail Infrastructure Limited’s (Network Rail’s) outputs and funding in control period 6 (CP6, which will run from 1 April 2019 to 31 March 2024). P

Network Charges - a consultation on how charges can improve efficiency

3 August 2016
Body
Date published: 10 December 2015 Closing date: 4 March 2016 This consultation looked at the way in which Network Rail charges train operators for use of its network. These charges affect decisions made by operators, Network Rail and funders. This was the first consultation as part of a comprehensive review of Network Rail’s structure of charges for Control Period 6, (CP6) - (2019-2024) and beyond

Comments invited on Railway Safety Regulations 1999 exemption application – train protection arrangements for running of Crossrail trains between Paddington and Heathrow Airport Junction

15 March 2016
Body
Date published: 2 September 2015 Closing date: 27 October 2015 We invited comments on an exemption application we received from Network Rail Infrastructure Limited in association with Crossrail Limited and MTR Corporation (Crossrail) Limited concerning the train protection arrangements for the running of Class 345 Crossrail passenger trains between Paddington and Heathrow Tunnel Junction. The

Consultation on Eurotunnel’s Network Statement

19 February 2016
Body
This consultation is now closed. Outcome Our comments have been developed in line with the principles set out in the co-operation agreement between ORR and ARAFER and with regard to the requirements of the Recast Directive (2012/34 EU). Eurotunnel Network Statement 2017 19 February 2016 Consultation Date published: 24 July 2015 Closing date: 18 September 2015 On 16 June 2015 Directive 2012/34/EU[1

Consultation on improving Schedule 5 of the model freight track access contract

20 January 2016
Body
On 6 November 2015 we consulted on proposed changes to Schedule 5 and the associated Rights Table in the model freight track access contract. This also included consequential changes to Schedule 4. These changes are to reflect the move away from freight access rights having "Levels" and towards having origin and destination timing windows for services. We also proposed to simplify the Rights Table

Call for evidence on passenger compensation

15 January 2016
Body
The purpose of this letter was to invite interested parties to submit evidence that may support ORR’s enquiries into the issues raised in the super-complaint made by Which? regarding rail passenger compensation.